Commercial Works - Traffic flow plates

Carris Construction carried out work to replace traffic flow plates following flooding issues and damage to existing flow plates by HGV traffic;

Works included; removal of existing traffic flow plates, installation of drainage to alleviate existing flooding, and installation of speed hump to control traffic speed,

this was a requirement of the traffic flow plates manufacturers warranty. Below are the results of the work completed mid 2008.

 

Removal of existing flow plates
Speed hump location
Drainage route excavated
Pre speed hump

 

 
New flow plates installed

 

Drainage pipe work completed
Run off drain to existing surface drain
 
F/W reinstated after drainage installation

 

Final Levels set
Warning signs installed

 
 
Prior to final C/W reinstatement

 

Speed Hump
Road Markings completed

 
 
Final Reinstatement complete

 

Traffic direction control in operation
 